Version 1.0.3 (16 Feb 2011)
|
|
---------------------------
|
|
|
|
This version include all fixed done since previous release. In the following
|
|
list the most important ones are highlighted.
|
|
|
|
* Advanced allocation screen. Disable start/end date changes in
|
|
advance allocation window. Graph dependencies are not travelled in this window
|
|
yet, so as temporary fix, it will not be allowed to change the start or the
|
|
end date of a task in this screen.
|
|
* Limiting resources. Several fixes on limiting resources planning window.
|
|
Moreover fixed Gantt view dependencies using limiting resources tasks.
|
|
* Allocation window. Improvements to avoid misunderstandings using the
|
|
interface.
|
|
|
|
Changes
|
|
~~~~~~~
|
|
|
|
* [Bug #848] Removed repeated method in OrderLineGroup.
|
|
* [Bug #851] fix bug
|
|
* [Bug #852] Fixed bug adding children advance if some indirect advance exists.
|
|
* Refactor
|
|
* [Bug #853] Fix bug
|
|
* [Bug #850] fix bug
|
|
* Added warning log message when fake advance is NULL in
|
|
ManageOrderElementAdvancesModel.
|
|
* Added warning log message when fake advance is NULL in
|
|
AdvanceAssignmentPlanningModel.
|
|
* [Bug #849] set the init date in with current date by default in cost category
|
|
view
|
|
* [Bug #849] fix the behaviour of the dates in the cost category view
|
|
* [Bug #848] Fix bug
|
|
* Removed extra padding appearing next to floating calendars
|
|
* [Bug #814] Fix bug
|
|
* [Bug #843] Fix bug
|
|
* Fixed nullpointer exception on work week date picker
|
|
* [Bug #842] Fix bug
|
|
* Avoid exception if effortAssigned is zero
|
|
* Remove unused field
|
|
* Use EffortDuration instead of hours to increase precision
|
|
* [Bug #840] Fix bug
|
|
* Expose methods to allow to get the EffortDuration elapsed in an interval of
|
|
IntraDayDates
|
|
* Fixed visibility problems of disabled inputs on Chrome
|
|
* [Bug #805] Fix bug
|
|
* [Bug #838] Fix bug
|
|
* Add method to allow to allocate hours outside the task's bounds
|
|
* Extract superclass and generalize the use of interval
|
|
* Rename onInterval method
|
|
* Rename methods
|
|
* Add documentation for method
|
|
* [Bug #838] Fix bug
|
|
* Replace "principal" by main
|
|
* Add related specific allocations second level
|
|
* Add new query for searching for specific allocations interfering with a
|
|
criterion
|
|
* Pull up method and do it more generic
|
|
* Refactor genericAllocationsByCriterion
|
|
* Adapt LoadPeriodGeneratorOnCriterion so it can work with specific allocations
|
|
* Avoid executing methods twice
|
|
* Avoid repeating query
|
|
* [Bug #837] Fix bug
|
|
* [Bug #819] Report internazionalization problem in webkit browsers
|
|
* [Bug #836] Fixed using English as default language
|
|
* [Bug #830] Remove unnecessary code
|
|
* [Bug #830] Changing in perspective does not reload data from database
|
|
* [Bug #833] Fix bug
|
|
* [Bug #833] Disable advance search button
|
|
* [Bug #835] Fix bug
|
|
* Some fix on Debian package folder.
|
|
* [Bug #828] Recreate dependencies on chaning horizontal scroll in limiting
|
|
* On changing zoom in limiting resources dependencies are not redrawn
|
|
* Small fix in a message that uses "fiscal code" instead of ID.
|
|
* [Bug #824] Fixed issue checking worker ID prior to criterions.
|
|
* Avoid memory leak
|
|
* [Bug #825] Fix bug
|
|
* [Bug #829] Don't let user change the type of a dependency between a Limiting
|
|
Task and any other type of Task
|
|
* [Bug #826] Fix bug Validating Exception on allocating a resource to a limiting
|
|
task the first time
|
|
* [Bug #826] For limiting tasks, update size of the task if the user changes the
|
|
numbers of hours allocated of the resource allocated in that task
|
|
* [Bug #821] Fix bug
|
|
* Not allow to allocate on intervals beyond a task's bounds
|
|
* The cells after the end of the task are not editable
|
|
* Extract method in order to encapsulate the rule in one place
|
|
* Eliminate code repetition
|
|
* Fixing the condition for isBeforeTaskStartDate
|
|
* [Bug #816] Fix bug
|
|
* Show saving message after the changes have really been done
|
|
* [Bug #807] Revamped cell styles in advanced assignment
|
|
* Graphical issues in taskdetails component
|
|
* Fix javascript error when resizing ganttpanel and chart is not shown
|
|
* [Bug #817] Fix bug
|
|
* Added horizontal line under timetracker header
|
|
|
|
|
|
Version 1.0.2 (21 Jan 2011)
|
|
---------------------------
|
|
|
|
Bugfixing release due to a problem with database installation that makes Debian
|
|
package not work if it was newly installed in a system. Apart from fixing this
|
|
important bug, this version also includes other fixes done since 1.0.1 release.
|
|
|
|
Notes
|
|
~~~~~
|
|
|
|
If you are upgrading from any 1.0.x verion, you will need to manually execute on
|
|
your database the SQL sentences from file:
|
|
``/usr/share/dbconfig-common/data/navalplan/upgrade/pgsql/1.0.0``
|
|
|
|
To get database access information review ``/etc/tomcat6/context.xml`` file.
|
|
|
|
Changes
|
|
~~~~~~~
|
|
|
|
* Fixed problem in Debian package install with some missing SQL sentences.
|
|
* Fix bug in 'Worker search' screen, close button was not working for limiting
|
|
resources
|
|
* [Bug #815] Fix bug
|
|
* Small enhancement in CutyCapt command.
|
|
* Fixed problem with CSS not being used in printing.
|
|
* [Bug #813] it corrects redirects in the editing virtual workers screen
|
|
* [Bug #812] changes Map for SortedMap in PredefinedDatabaseSnapshots
|
|
* [Bug #812] sorts the combo of multiple search in allocation pop-up.
|
|
* [Bug #796] Fixed. The problem is that the AdvanceMeasurement was still marked
|
|
as transient.
|
|
* [Bug #811] Translate pending messages including string 'nif/NIF'
|
|
* [Bug #797] checks out if obligatory data are introduced to create a new
|
|
project.
|
|
* [Bug #797] checks out that deadline is greater than start date in project
|
|
popup window.
|
|
* [Bug #803] Refactor LimitingResourcesPanel
|
|
* [Bug #803] Fix bug dependencies were not being drawn again on changing zoom
|
|
level in LimitingResources
|
|
* [Bug #809] Fixed marking to translate missing label.
|
|
* Fixed wrong e-mail on debian/changelog.
|
|
|
|
|
|
Version 1.0.1 (14 Jan 2011)
|
|
---------------------------
|
|
|
|
Bugfixing release due to a missing dependency on Debian packages that make
|
|
reports do not work on 1.0.0. Apart from fixing the Debian package other fixes
|
|
done during last week are also included in this release.
|
|
|
|
Changes
|
|
~~~~~~~
|
|
|
|
* Updated TODO file with decisions from roadmap meeting.
|
|
* [Bug #803] Remove unused code
|
|
* [Bug #803] Change Zoom level in LimitingResources launches Validation
|
|
exception
|
|
* [Bug #804] Fix bug
|
|
* [Bug #788] changes the structure and labels in resource load view.
|
|
* [Bug #808] Fix bug when a resource field in Resource search is selected for
|
|
the first time, set 'Current selection' as name of that resource
|
|
* [Bug #785] fixes translations in company list.
|
|
* Added dependency with ttf-freefont on debian/control.
|
|
* [Bug #801] Fixed typo in Spanish translation.
|
|
* [Bug #785] Add improvements in companies list.
|
|
* [Bug #784] Sort results of add criterion combo in resource edition
|
|
* Reset the progressmeter to zero when the MonteCarlo chart is closed
|
|
* [Bug #800] Fix closable button in 'Calendar allocation' window
|
|
* [Bug #800] Fix closable button in 'Progress consolidation' window
|
|
* [Bug #800] Add closable button to 'Progress assignment' window
|
|
* [Bug #800] Add closable button to 'Project details' window
|
|
* [Bug #782] Fix bug
|
|
* Fix asyncNotifications
|
|
* Fix the type parameter
|
|
* [Bug #779] Fix bug
|
|
* Avoid LazyInitializationException accessing template's labels
|
|
* [Bug #798] Refactor 'Remove Criterion' window, change it for a MessageBox
|
|
window
|
|
* [Bug #795] Refactor calendar remove dialog box and change it to a MessageBox
|
|
|
|
|
|
Version 1.0.0 (07 Jan 2011)
|
|
---------------------------
|
|
|
|
This is the first statble release of *NavalPlan*, a free software web
|
|
application for project management.
|
|
|
|
Main features
|
|
~~~~~~~~~~~~~
|
|
|
|
* Multiproject management. It offers a global vision of the company managing
|
|
several projects sharing resources.
|
|
* Group resource allocations: dynamic groups based on criteria.
|
|
* Flexible calendars.
|
|
* Configurable Gantt chart from Work Breakdown Structure (WBS).
|
|
* Resource Breakdown Structure (RBS) chart.
|
|
* Overload resource allocation control.
|
|
* Earned Value Management (EVM).
|
|
* Cost analysis based on work reports.
|
|
* Integration with other *NavalPlan* instances and third-parties.
|
|
* Other functionalities: materials, quality forms, project templates, planning
|
|
scenarios, multiple task progress measurement ...
|
|
|
|
Latest features
|
|
~~~~~~~~~~~~~~~
|
|
|
|
* Backwards planning with new restrictions (AS_LATE_AS_POSSIBLE and
|
|
FINISH_NOT_LATER_THAN).
|
|
* Two direction resource allocation schemes. Forwards and backwards strategies
|
|
supported depending on Gantt conditions.
|
|
* Time unit inferior to hours in calendars. Minutes and seconds are allowed.
|
|
* Experimental support for limiting resources.
|
|
* Monte Carlo technique for project duration simulation. Duration probability
|
|
functions are calculated based on likelihood estimations.
|
|
* Sigmoid advance resource allocation function approaching what happens in real
|
|
world.
|
|
* Monitorization of project progress based on critical path progresses.
|
|
* Human readable codes generation for data.
|
|
* Configurable display of advances and cost in planning tasks.
|
|
* Database migration support. Automatic management of database refactorings
|
|
keeping former data.
|